Tech

U Mobile Signs to Run Private 5G at Kedah's 152.7MWp Solar Plant, Due in 2028

U Mobile signed a Strategic Alliance Agreement with HLGY Energy to bring private 5G and AI to a 152.7MWp solar plant in Kedah, due to start in 2028.


Features Editor · 17 Nov 2026, 3:12pm
U Mobile Signs to Run Private 5G at Kedah's 152.7MWp Solar Plant, Due in 2028

U Mobile has moved from talking about a smart solar farm to signing up for one. A month after its Memorandum of Understanding with HLGY Energy, the telco signed a Strategic Alliance Agreement on 17 November that makes it HLGY's preferred telecommunications, connectivity and technology partner for the Kedah Rubber City Solar Power Plant in Padang Terap, Kedah.

Contents

Quick facts

  • The plant: about 300 acres in Padang Terap, Kedah, with 152.7MWp of solar capacity
  • Storage: a 60.48MW / 240.72MWh Battery Energy Storage System
  • Start date: operations scheduled for the first half of 2028
  • U Mobile's role: private 5G, AI analytics, intelligent surveillance and real-time monitoring
HLGY Energy and partners at the Kedah Rubber City Solar Power Plant signing ceremony
HLGY Energy with its partners U Mobile, Bridge Data Centers, AmBank Islamic, MABCON and Asia CarbonX Change at the signing in Kuala Lumpur. Image: U Mobile

What U Mobile will actually do on site

U Mobile's proposed private 5G network is meant to be the connectivity backbone of the plant: a dedicated network that carries AI-powered analytics, intelligent surveillance and real-time monitoring across the site. The two companies say they will also look at digital twins, a live virtual copy of the plant, and a single operations platform to monitor and manage it.

The October MoU only committed both sides to explore the idea. This agreement starts defining the digital infrastructure the plant will run on, though the release still calls the 5G solution "proposed", so the final design is not yet fixed.

"U Mobile's role goes beyond providing connectivity," said How Lih Ren, Chief Business Officer of U Mobile. "We want to enable the secure, intelligent digital foundation that allows industries to operate more efficiently."

Kedah Rubber City Solar Power Plant: 152.7MWp solar capacity
The plant U Mobile will connect, by the numbers. Source: U Mobile and HLGY Energy

Why it matters for Malaysia

The plant is being built under the Corporate Renewable Energy Supply Scheme (CRESS), which lets companies buy renewable electricity directly through the grid. The signing was officiated by Rosmahyuddin Baharuddin, Undersecretary of the Sustainable Energy Division at the Ministry of Energy Transition and Water Transformation (PETRA), and HLGY's other partners on the project include Bridge Data Centers and AmBank Islamic.

For U Mobile it is another enterprise deal for its ULTRA5G network, after it signed up to power the Johor-Singapore RTS Link with 5G and reached 90% 5G coverage in Malaysia nine months early. Phone users will not notice any of this directly, but private 5G sites like this one are how operators earn back what they spent on their networks. The real test comes in 2028, when the plant is due to start running.

More from ProductNation